Completed

CONSTRUCTION OF POB ALONG UPPER CHANGI ROAD

Project awarded by ITE, the length of this Pedestrian Overhead Bridge is around 40m in length. The construction period that includes the piling work took approximately 5 months. The Design & Build bridge consists of roof finishes and cladding that are then wrapped around the PSPC beam.

Array