Completed

CONSTRUCTION OF POB AT TELOK BLANGAH

Project awarded by Harbourfront Six Pte Ltd, this Pedestrian Overhead Bridge consists of 4 supporting beams and is approximately 113m in length, of which the longest section is 36.3m long. The key challenge of this project lies in the construction of bridge work located just below Telok Blangah Viaduct (ie. a bridge beneath a bridge). This project was successfully completed in just 6 months time.

Array