Completed

CONSTRUCTION OF POB, BUS SHELTER & COVERED LINKWAY AT REPUBLIC POLYTECHNIC

Project awarded by the Republic Polytechnic, the length of the Pedestrian Overhead Bridge is around 35m that is supported by 2 beams. The design of this bridge consists of having aluminium cladding around the bridge, the covered linkway and the bus shelter to present a very futuristic outlook. This project was completed in a short span of 6 months, bridging commuters and students travelling between Republic Polytechnic & Woodlands MRT Station.

Array