Completed

RELOCATION & MODIFICATION OF PSPB BEAM FOR POB ALONG PASIR PANJANG ROAD

Awarded by Land Transport Authority as part of an ongoing project for MRT Circle Line Stage 4, the PSPC beam of this new Pedestrian Overhead Bridge was recycled from an existing bridge located along Pasir Panjang. Having removed the excess length of the prior beam, the modified beam is then relocated and launched infront of Haw Par Villa. This entire project took only a short span of 4 months to complete.